What We Do

What We Do

At March Cato, we love a challenge, whether it’s deep, large diameter, lots of interfaces, complex ground conditions or difficult access – whatever the challenges are, this is what we are all about. Over the last 29 years, we have tackled some of Auckland’s most difficult and high profile infrastructure projects and have grown an enviable reputation with our fantastic clients for the safe delivery of these challenging works. We specialise in the following:

Pipe Jacking and Guided Auger Bore

At March Cato, we have the plant, the people and the experience to help you with all your pipejacking, and micro tunnelling needs. Having delivered numerous projects for clients such as KiwiRail, Auckland Council and Watercare installing pipes ranging from 500mm up to 2000mm. Our team are experienced in dealing with a variety of geology, from running sands to basalt all whilst managing ground water extraction and minimising frac-out and settlement risks.

Open Trench Construction      

We own and operate a large, well-maintained fleet of excavators ranging from our small 1T machines, all the way up to 47T excavators. We are particularly proud of our fleet of 20T and 30T zero swing excavators which offer tremendous power within a small footprint, enabling us to break rock, lift pipes and complete works in narrow streets and residential areas. In addition to these machines, we also own a number of sheet pilers, rock breakers as well as our own bespoke design trench shields and shoring systems, ensuring that we are able to trench through a variety of ground conditions, from very week silty sands, peats and clays, right through to cemented tuff and basalt. 

Our trenching crews are supported by a fleet of 6W and Artic Trucks, which also includes a Transporter, Hydrovac and Hiab as well as well as our own, in-house traffic management team, who are experienced in dealing with the unique conditions and environments that we operate in.

Our crews are experienced with the installation of all modern specified pipe materials, including HDPE, PVC, GRP, Concrete, DICL and CLS.

Cut-in’s and Connections 

March Cato, along with our welding and fabrication partners, Olsen Welding, have led and managed a number of successful and operationally critical connections and cut-in’s for Watercare. Our team have the skill and experience to manage the complete scope of these types of works, including the detailed planning with Watercare’s operations teams, fabrication of spools and fittings, disinfection and pressure testing, as well as the shutdown of the existing assets in preparation to successful cut-in, install and handover the new assets. 

Pump Station Construction and Refurbishment       

With a team of water and wastewater specialists in our business, we are able to plan and manage the construction of water and wastewater Pump Stations, including management of the design and construction of the temporary works, shafts, pits and chambers required for the civil construction works as  well as the Mechanical and Electrical design, fabrication, installation and commissioning.  

Emergency Works 

We are proud that our team is regularly relied upon to respond to our clients emergency works. Be it a transmission pipeline failure, pump station fault or large sinkhole/tomo opening up in the middle of the city, our team of skilled professionals are trusted to rapidly review the problem and develop practical safe methodologies in conjunction with our clients, to recover the situation and repair the fault.     

Pipe Jacking and Guided Auger Bore
Open Trench Construction
Pump Station Construction and Refurbishment
Micro tunnelling
Connections and Cut-ins